Calcasieu River, Mile 17.0 to 34.0

Project Description

<p>The Calcasieu River project consisted of removing material from within the Calcasieu River Ship Channel and placing the material within the designated Confined Disposal Facilities (CDFs) adjacent to the Calcasieu River and Pass-- including removal of material from Devil's Elbow. The project also included retention dike construction, and extensive surveys, as well as ditching and draining of disposal areas, removing a weir structure and replacing it with an updated weir.</p>

Client

US Army Corps of Engineers
https://www.usace.army.mil/

Dredge(s) Used

Dredge 32, Dredge Mike Hooks

Cubic Yards

4238171 CY

Duration

165 days

Completion Date

June 2020